首页 - 网校 - 万题库 - 美好明天 - 直播 - 导航
您现在的位置: 考试吧 > 英语四六级考试 > 学习资料 > 英语六级 > 阅读 > 正文

2014年6月英语六级阅读理解预测题及答案2

来源:考试吧 2014-03-09 12:18:47 要考试,上考试吧! 英语四六级万题库
2014年6月英语六级阅读理解预测题及答案提供给各位考生备考,更多考试资料请持续关注考试吧英语四六级考试频道!

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  参考答案: 1. A 2. C 3. B 4. D 5. A

  相关推荐:

  2014年6月英语六级作文预测范文汇总

  2014年6月英语六级翻译新题型预测汇总

  各地2014年6月英语四六级考试报名时间汇总

  考试吧特别策划:2014年英语四六级考试报考指南

0
收藏该文章
0
收藏该文章
文章搜索
万题库小程序
万题库小程序
·章节视频 ·章节练习
·免费真题 ·模考试题
微信扫码,立即获取!
扫码免费使用
英语四级
共计423课时
讲义已上传
30206人在学
英语六级
共计313课时
讲义已上传
20312人在学
阅读理解
共计687课时
讲义已上传
5277人在学
完形填空
共计369课时
讲义已上传
13161人在学
作文
共计581课时
讲义已上传
7187人在学
推荐使用万题库APP学习
扫一扫,下载万题库
手机学习,复习效率提升50%!
版权声明:如果英语四六级考试网所转载内容不慎侵犯了您的权益,请与我们联系800@exam8.com,我们将会及时处理。如转载本英语四六级考试网内容,请注明出处。
Copyright © 2004- 考试吧英语四六级考试网 出版物经营许可证新出发京批字第直170033号 
京ICP证060677 京ICP备05005269号 中国科学院研究生院权威支持(北京)
精选6套卷
8次直播课
大数据宝典
通关大法!